检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:池小兰[1] Chi Xiaolan(Fujian Forestry Vocational Technical College, Nanping 353000, China)
出 处:《环境科学与管理》2019年第1期57-61,共5页Environmental Science and Management
摘 要:以某市某建筑项目为研究对象,对建筑施工现场的硫化氢、二氧化硫等气体污染、固体污染、水污染、光污染以及噪声污染等污染源进行监测。监测结果显示,建筑施工产生的气体中,氨气的含量最大,其他气体基本为低于或等于标准限值的状态,对不同污染源带来的环境问题进行分析。提出减排需解决的问题:水污染治理;噪声污染治理;气体污染治理;光污染治理;将其他污染源的治理划分为建筑周围边坡保护、施工道路的防护、水土流失防治几方面。Taking a certain construction project in a certain city as the research object, the pollution sources such as hydrogen sulfide, sulfur dioxide and other gas pollution, solid pollution, water pollution, light pollution and noise pollution are monitored at the construction site. The monitoring results show that the amount of ammonia gas in the gas generated by construction is the largest, and other gases are basically below or equal to the standard limit, and the environmental problems brought by different pollution sources are analyzed. The problems that need to be addressed in the reduction of emissions are proposed: water pollution control;noise pollution control;gas pollution control;light pollution control;and other pollution sources are divided into slope protection around the building, protection of construction roads, and prevention of soil erosion.
分 类 号:X22[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117