检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋桂梅[1] 王树芳 Jiang Guimei;Wang Shufang(Shaanxi Railway Engineering Vocational and Technical College, Weinan, Shaanxi 714000;Zhongjiao Tunnel Engineering BureauCo., Ltd., Longquan, Zhejiang 323700)
机构地区:[1]陕西铁路工程职业技术学院,陕西渭南714000 [2]中交隧道工程局有限责任公司,浙江龙泉323700
出 处:《江西建材》2019年第4期209-210,共2页Jiangxi Building Materials
基 金:陕西铁路工程职业技术学院科研基金项目(KY2018-16)
摘 要:本文分析了铁路桥梁工程项目预算定额与实际施工造价确定存在的差异,并提出几点优化措施,以期增强定额确定项目造价科学性、合理性、准确性,为预算定额在铁路桥梁工程中的推广应用提供有益指导。The difference between the budget quota and the actual construction cost of the railway bridge project is analyzed, and some optimization measures are put forward, with a view to strengthening the quota to determine the scientific, reasonable and accurate cost of the project. And provides the beneficial guidance for the popularization and application of the budget quota in the railway bridge engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69