小净距并行隧道开挖间距研究  被引量:2

STUDY ON EXCAVATION INTERVAL OF SMALL CLEAR DISTANCE PARALLEL TUNNEL

在线阅读下载全文

作  者:刘德乾[1] 席书霞 申晓璐 LIU De-qian;XI Shu-xia;SHEN Xiao-lu(Hebei University of Engineering, 056038, Handan, Hebei, China)

机构地区:[1]河北工程大学土木工程学院

出  处:《建筑技术》2019年第5期534-537,共4页Architecture Technology

基  金:河北工程大学与中铁十九局轨道公司合作项目(20160616)

摘  要:广州地铁21号线长平站区间小净距并行隧道左右线施工时会多次扰动围岩,为避免形成围岩应力叠加,须确定合理的支护时机并尽量减少围岩变形。根据测点变形速率的变化,分析20m的开挖间距下测点的拱顶下沉、水平净空值,证明在V类围岩条件下,两条隧道的开挖间距为20m是可行的,但需注意采取措施控制沉降。The surrounding rock will be disturbed many times during the construction of the left and right sides of the parallel tunnel with small net distance between the changping station area of guangzhou metro line 21. According to the change of deformation rate of the measured point, the vault settlement and horizontal clearance value of the measured point at the excavation interval of 20 m are analyzed, and it is proved that the excavation interval of the two tunnels is 20 m under the condition of v-type surrounding rock, but it is necessary to take measures to control the settlement.

关 键 词:小净距 并行隧道 开挖间距 

分 类 号:TU745.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象