铁路大型高速普速共构车站增设固定真空卸污系统施工研究  被引量:1

Research on the Construction of Fixed Vacuum Unloading System in Railway Large-scale High-speed and General-speed Co-construction Stations

在线阅读下载全文

作  者:郭斌 GUO Bin(China Railway Shanghai Bureau Group Co.,Ltd. Hefei Railway Hub Project Construction Headquarters,Hefei 230022,China)

机构地区:[1]中国铁路上海局集团有限公司合肥铁路枢纽工程建设指挥部

出  处:《价值工程》2019年第18期207-210,共4页Value Engineering

摘  要:铁路既有客站增设固定真空卸污系统是适应铁路发展的必然趋势,也是自觉落实国家环保政策的要求之所在。本文以合肥站增设固定真空卸污系统施工为例,对既有大型高速、普速共构站增设该项工程施工的重难点进行分析研究并提出相应措施。It is an inevitable trend for railway stations to add fixed vacuum discharge system to meet the development of railway, and it is also the requirement of consciously implementing the national environmental protection policy. Taking the construction of fixed vacuum discharge system in Hefei Station as an example, this paper analyzed and studied the key and difficult points in the construction of adding this project to the existing large high-speed and general-speed co-construction station, and put forward corresponding measures.

关 键 词:真空卸污系统 既有大客站 施工 

分 类 号:U291.1[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象