检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭斌 GUO Bin(China Railway Shanghai Bureau Group Co.,Ltd. Hefei Railway Hub Project Construction Headquarters,Hefei 230022,China)
机构地区:[1]中国铁路上海局集团有限公司合肥铁路枢纽工程建设指挥部
出 处:《价值工程》2019年第18期207-210,共4页Value Engineering
摘 要:铁路既有客站增设固定真空卸污系统是适应铁路发展的必然趋势,也是自觉落实国家环保政策的要求之所在。本文以合肥站增设固定真空卸污系统施工为例,对既有大型高速、普速共构站增设该项工程施工的重难点进行分析研究并提出相应措施。It is an inevitable trend for railway stations to add fixed vacuum discharge system to meet the development of railway, and it is also the requirement of consciously implementing the national environmental protection policy. Taking the construction of fixed vacuum discharge system in Hefei Station as an example, this paper analyzed and studied the key and difficult points in the construction of adding this project to the existing large high-speed and general-speed co-construction station, and put forward corresponding measures.
分 类 号:U291.1[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249