检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔少波 KONG Shao-bo(Shantou Su'ai Tunnel Construction Investment Development Co.,Ltd.,Shantou 515000,Guangdong,China)
机构地区:[1]汕头市苏埃通道建设投资发展有限公司,广东汕头515000
出 处:《安全与环境学报》2019年第3期804-812,共9页Journal of Safety and Environment
摘 要:为防止盾构隧道行车道发生火灾时烟气侵入人员疏散通道,可通过在盾构隧道疏散通道内设置独立机械加压送风系统保证疏散通道内正压状态进行防烟,提高人员疏散安全性。分别利用风速法和压差法对某隧道工程疏散通道加压送风系统送风量进行试算,并采用FDS(Fire Dynamics Simulator)软件对疏散前室送风、疏散通道单侧送风及疏散通道双侧送风3种加压送风方式进行模拟分析,对比不同加压送风方式下各疏散口风速、温度、能见度的情况。结果表明,通过风速法计算得到的加压送风量要大于压差法。采用前室加压送风会造成较强的气流扰动,导致疏散口附近风速及温度剧烈波动,部分烟气进入前室,不利于人员疏散。采用疏散通道加压送风时,疏散口处风速稳定。但采用单侧加压送风时,火源下游疏散口处会有部分烟气积聚,影响人员疏散。采用双侧加压送风时烟气积聚少,疏散口附近温度、能见度等安全指标均在临界范围内,防烟效果良好,可以保证人员疏散安全。因此,建议采用纵向疏散通道加压送风,送风量建议采用风速法计算,当采用纵向疏散通道双侧加压送风时,建议在风速法得出的送风量基础上增加10%作为安全值。This paper intends to provide its own approach to calculation and analysis of the pressurized air supply efficiency for the evacuation passage of the shield-type tunnel to prevent smoke invasion into the workmen evacuation from the passage. For the said purpose,we have calculated and worked out the air supply volume of the pressurized air supply system of the tunnel project through a fire dynamic simulation( short for FDS) in such a shield tunnel by using the wind velocity method and the differential pressure method. Specifically speaking,the simulation has been done in 3 different types of pressurized air supply mode,i. e. the antechamber’s air supply,the single side and both sides of the air supply of the evacuation passage. For example,to prevent the smoke and fire from invading into the personnel evacuation passage of the tunnel,we have managed to set up an independent mechanical pressurized air supply system in the evacuation passage of the shield tunnel to ensure the positive pressure of the passage to prevent from and improve the safety of the smoke evacuation. What is more,we have also made a careful comparison between the wind velocity of evacuation,the temperature and the visibility of the different air supply modes. As a result of the comparison,we have identified and determinated that the pressurized air supply volume by the wind velocity method proves to be greater than that given by the differential pressure method. This is because the antechamber air supply tends to cause strong airflow disturbance,and in turn result in the fluctuation of the wind velocity and temperature around the evacuation outlet. What is more,the smoke invasion into the antechambers tends to be harmful for the workmen evacuation. However,if the air supply system is installed in the evacuation passage,the wind velocity can be made stable for the evacuation spot. However,when the single side pressurized air supply is used,it would be possible to accumulate some smoke supply at the evacuation passage in the downstream direction
关 键 词:安全工程 盾构隧道 疏散通道 加压送风 烟气控制
分 类 号:U459.4[建筑科学—桥梁与隧道工程] U459.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3