检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:B.N.V.Siva Prasad A.P. Thapliyal Rabi Bhusan Sripad R. Naik
机构地区:[1]Scientist,National Institute of Rock Mechanics,Bengaluru,India [2]Senior Geologist,Geological Survey of India,Dehradun,India
出 处:《Journal of Geological Research》2019年第1期5-11,共7页地质研究(英文)
摘 要:On 3^rd March, 2016, there occurred a massive roof fall incidence in one of the major caverns of Punatsangchhu-II Hydroelectric Project (PHEP-II), Bhutan which halted the operations in the major caverns and required additional strengthening measures. Prior to concluding any thing on the treatment measures for the muck flown into the cavern and the cavity formed over the crown of Downstream Surge Chamber, there was a strong need to determine the extents of cavity. Even to understand the influence of cavity formation on adjacent caverns, the cavity needs to be delineated. Therefore, the management of PHEP-II adopted several techniques to decipher the shape and dimensions of the cavity like, surveying, geophysical, cross-hole seismic surveys, borehole scanning, and exploratory drilling. The tentative shape of the cavity could finally be established. The findings from each method are explained in this paper.
关 键 词:CAVITY Large caverns Hydroelectric PROJECT Tomography CAVITY monitoring system
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90