PPP项目效率的构念建立及维度划分——基于扎根理论的探索性研究  被引量:4

Establishment and Dimensions Division of the Efficiency of PPP Project:An Exploratory Research Based on Grounded Theory

在线阅读下载全文

作  者:杜亚灵[1] 寇越 柯丹 Du Yaling;Kou Yue;Ke Dan(Tianjin University of Technology, Tianjin 300384, China;Heaven and Earth Holding Co., Ltd, Beijing 100013, China)

机构地区:[1]天津理工大学管理学院,天津300384 [2]天地控股有限公司,北京100013

出  处:《科技管理研究》2019年第13期229-235,共7页Science and Technology Management Research

基  金:国家自然科学基金面上项目“PPP项目中信任的动态演化机理研究:基于政府部门视角”(71372110);第二批天津市人才发展特殊支持计划项目“青年拔尖人才”(501010004)

摘  要:公私双方良好的合作是PPP项目成功的关键,而以往的项目成功和项目(管理)绩效无法对双方合作效果作出更细致的评价,故基于契约经济学中的合同效率,提出PPP项目效率这一构念。首先,基于扎根理论,通过文献分析及访谈获取原始资料,并导入NVivo10软件进行编码,得到PPP项目效率的维度划分,包括21个副范畴、8个主范畴及3个副核心范畴;其次,根据编码结果得出PPP项目效率概念模型,对相应的概念作出释义,并与既有的类似概念进行区分。研究结果表明:PPP项目效率与先天性、客观性因素无关,主要由相关制度安排以及项目参与者因素决定,最终通过合同主体的履约程度、项目目标的实现程度以及核心利益相关者的满意程度来衡量。Good cooperation between the public and the private is the key for PPP projects to get success, however the project success and the project(management) performance cannot make a more detailed evaluation on the cooperation effects of the public and the private, therefore, based on the contract efficiency in contract economics, this paper puts forward the idea of PPP project efficiency. Firstly, based on grounded theory, the original data are obtained through literature analysis and interview, and the research materials are coded through the software of NVivo 10 to get the dimension of PPP project efficiency, which includes twenty-one sub categories, eight main categories and three subcore categories. Secondly, the concept model of PPP project efficiency is obtained according to the coding results,corresponding concepts are interpreted, and the definition of the concept is proposed by distinguishing the existing similar concepts. The results show that: the efficiency of PPP project has nothing to do with the innate and objectivity factors, which is mainly determined by the relevant institutional arrangements and the factors of project participants;and the efficiency of PPP project is measured by the degree of performance of the contract subject, the realization degree of the project goal and the satisfaction degree of the core stakeholders.

关 键 词:PPP项目 PPP项目效率 项目成功 项目(管理)绩效 扎根理论 

分 类 号:F294[经济管理—国民经济] G301[文化科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象