检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周晨梦 罗日成[1] 吴东 杨雅倩 李智琦 潘俊文 袁丽苹 邹明 ZHOU Chenmeng;LUO Richeng;WU Dong;YANG Yaqian;LI Zhiqi;PAN Junwen;UAN Liping;ZOU Ming(School of Electrical and Information Engineering,Changsha University of Science & Technology,Changsha 410004,China;State Grid Shandong Electric Power Company Zibo Power Supply Company,Shandong Zibo 255000,China;Suizhou Power Supply Company of Hubei Electric Power Company,Hubei Suizhou 441300,China;State Grid Hunan Electrical Power Company Maintenance Company,Changsha 410000,China)
机构地区:[1]长沙理工大学电气与信息工程学院,长沙410004 [2]国网山东省电力公司淄博供电公司,山东淄博255000 [3]国网湖北省电力有限公司随州供电公司,湖北随州441300 [4]国网湖南省电力公司检修公司,长沙410000
出 处:《高压电器》2019年第9期179-186,共8页High Voltage Apparatus
基 金:国家自然科学基金资助课题(50977003);电力与交通安全监控及节能技术教育部工程研究中心基金(2010#03)~~
摘 要:为确保±800kV直流输电线路带电作业的安全可靠,文中结合工程实际,搭建直流输电线路小转角塔等比例模型,并使用ANSOFT软件对吊篮法和软梯法两种不同作业方式下人体体表场强的大小进行了计算,分析并得出带电作业人员进出等电位过程中宜推荐的方式和路径,进而确定了带电作业人员应采取的安全防护措施。结果表明:采用吊篮法进出等电位过程中,作业人员体表平均场强相比软梯法更小,综合作业方式的劳累程度和可操作性,推荐作业人员采用吊篮法的方式进出等电位;作业人员进出等电位的过程中应穿戴屏蔽效率为60dB、配有金属丝面罩的直流特高压专用屏蔽服。以上结论能为±800kV直流输电线路小转角塔带电作业的顺利开展及安全防护措施的制定提供理论依据。In order to ensure the safe of live working of±800 kV DC transmission line,combined with the engineering practice,an equal scale model of small angle tower for HVDC transmission lines is constructed.The values of field strength of the body surface in two different operation modes are calculated by using ANSOFT software.The recommended methods and paths in the process of equipotential handling are analyzed and obtained,and then the safety measures should be taken by the electrified operators.The results show that when using a hanging basket for equipotential operation,the average intensity of workers body is smaller than the soft ladder way,according to the degree of fatigue and operability of operation methods,it is recommended that operators use the hanging basket method to enter and exit equipotential;When performing equipotential operation,the operator shall wear a direct current ultra-high voltage shielding shield with a shielding efficiency of 60 dB and a metal wire mask.The above conclusions provide a theoretical basis for the live working on the small angle tower of±800 kV DC transmission line.
关 键 词:带电作业 小转角塔 作业方式 危险率 体表场强 电场防护
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222