检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈洋 SHEN Yang(Shandong Jitie Design Consulting Co.,Ltd.,Ji'nan 250000,China)
出 处:《价值工程》2019年第28期194-195,共2页Value Engineering
摘 要:基于时代发展,我国交通事业发展较为迅猛,其隧道工程建设规模和数量日益提升。而在具体隧道施工过程中,部分工程涉及到铁路的下穿。而当隧道下穿过程中,既有铁路势必会受到不同程度的影响,进而引发路基沉降等现象,对铁路实际作用的发挥产生严重的影响。基于此,本文针对新建隧道下穿施工对既有铁路的影响问题进行分析研究。With the development of the times, China's transportation industry is developing rapidly, and the scale and number of tunnel construction projects are increasing. In the concrete tunnel construction process, part of the project involves the underpass of the railway. When the tunnel underpassing railway, the existing railways are bound to be affected to varying degrees, which in turn causes roadbed settlement and other phenomena, which has a serious impact on the actual operation of the railway. Based on this, this paper analyzes and studies the impact of the new tunnel underpass construction on the existing railway.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46