盾构隧道轨下结构同步预制施工技术的研究  

Study on Synchronous Prefabrication Construction Technology of the Structure Under Rail of Shield Tunnel

在线阅读下载全文

作  者:王瑞红 WANG Rui-hong(China Railway 14th Bureau Group Fangqiao Co. Ltd.,Beijing 102400,China)

机构地区:[1]中铁十四局集团房桥有限公司

出  处:《工程建设与设计》2019年第20期155-156,共2页Construction & Design for Engineering

摘  要:为推进盾构回填一体化施工工艺,特针对盾构隧道轨下结构同步预制施工技术进行研究。结合铁路领域全国首次轨下结构同步预制项目,论文详细总结了轨下预制块施工组织、钢模结构的设计优化、生产关键技术控制等内容,为类似工程提供借鉴。In order to promote the integrated construction technology of shield backfilling, this paper studies the synchronous prefabrication construction technology of the structure under the rail of shield tunnel. Combined with the project of synchronous prefabrication of subrail structures in China for the first time in the field of railway, this paper summarizes in detail the construction organization of subrail prefabricated blocks, optimization of steel mold structure design, and control of key production technologies, providing reference for similar projects.

关 键 词:盾构隧道 轨下结构 同步施工 施工技术 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象