检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王嵛 黄耀英[1] 刘钰[1] 肖磊[1] 袁斌[1] WANG Yu;HUANG Yao-ying;LIU Yu;XIAO Lei;YUAN Bin(College of Hydraulic&Environment Engineering,China Three Gorges University,Yichang443002,China)
机构地区:[1]三峡大学水利与环境学院
出 处:《长江科学院院报》2019年第11期21-26,共6页Journal of Changjiang River Scientific Research Institute
基 金:国家自然科学基金项目(51779130)
摘 要:虽然基于大型渡槽实测资料建立数学监控模型可以有效地分析渡槽工作性态,但大型渡槽的工作状态复杂,而数学监控模型易受经验性和多重共线性的影响,导致钢筋计实测应力的可靠性难以判断。结合某大型渡槽实测资料,对该渡槽1号、2号钢筋计建立实测钢筋应力统计模型和混合模型,然后分别采用逐步回归法和复合形优化算法对上述模型进行参数估计,进而对比分析不同模型分离出的水压分量。分析表明,虽然该渡槽2号钢筋计实测应力具有一定的规律,但不同分析方法分离出的水压分量变化规律均不符合一般力学规律,由此认为该钢筋计测值异常,不具有可靠性,故该钢筋计测值不可用于分析渡槽的实际工作性态。The working condition of aqueduct can be analyzed effectively by mathematical monitoring model based on measured data.The reliability of measured steel bar stress,however,is difficult to be confirmed as the mathematical model is prone to be affected by the experience and multicolinearity due to the complex working conditions of aqueduct.In this research,the statistical model and mixed model of measured steel bar stress of a large aqueduct were established based on measured data;subsequently,the parameters of the established models were estimated using stepwise regression and compound model method to compare the water pressure components separated by different models.The analysis result showed that although the measured stress of steel bar No.2 in the aqueduct is somewhat regular,the variation law of the water pressure component separated by different analysis methods does not conform to the general laws of mechanics.Therefore,the measured value of the steel bar is considered abnormal and unreliable,hence cannot be employed to analyze the actual status of aqueduct.
关 键 词:渡槽 实测钢筋应力 可靠性 统计模型 混合模型 逐步回归法 复合形优化算法
分 类 号:TV672.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117