检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马超 Ma Chao(China Railway First Survey and Design Institute Group Co.,Ltd.,Shanxi Xi'an 710043)
机构地区:[1]中铁第一勘察设计院集团有限公司
出 处:《科技风》2019年第32期125-126,共2页
摘 要:新建西宁至成都铁路位于青海、甘肃、四川三省交界地带,是我国“八纵八横”高速铁路纵向主通道兰(西)广通道的重要组成部分。新建正线长度496.67km,本线自北向南依次经西宁盆地区、拉脊山中高山区、华隆盆地区、西秦岭中高山区、若尔盖高原区、岷山中高山区六个地貌单元。本次对西秦岭越岭地段铁路综合选线技术进行研究,结合地形地貌、地质、站址选择、线路条件及工程投资等多方面因素对该区域线路方案进行综合比选推荐。Xining-Chengdu Railway is located at the junction of Qinghai,Gansu and Sichuan provinces.It is an important part of Lan(West)Guangzhou Channel,the main longitudinal channel of the"Eight Longitudinal and Eight Horizontal"high-speed railway in China.The new main line is 496.67 km in length.From north to south,the line passes through six geomorphic units,namely,Xining Basin,Laji Mountains,Hualong Basin,West Qinling Mountains,Zoige Plateau and Minshan Mountains.This paper studies the comprehensive railway route selection technology in the cross-ridge area of the West Qinling Mountains,and makes a comprehensive comparison and recommendation of the railway route scheme in this area based on various factors such as topography,geology,site selection,line conditions and project investment.
分 类 号:U21[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70