检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:时付山 Shi Fushan(State Grid Shandong Electric Power Company Dezhou Power Supply Company,Dezhou Shandong,253000)
机构地区:[1]国网山东省电力公司德州供电公司
出 处:《电子测试》2019年第23期103-104,95,共3页Electronic Test
摘 要:带电作业是同塔多回输电线路的重要检修方式,目的是减少停电时间和停电次数。本文通过结合同塔多回路线路的特征,对同塔多回路输电线路的运行设备相关参数进行分析,针对带电作业进行安全性评价、危险率分析、工作人员体表场强分析,提出相关防护措施,完成对同塔多回路线路带电作业的可行性分析。Live-line operation is an important maintenance method for Multi-circuit Transmission Lines on the same tower. The purpose is to reduce the outage time and frequency. Based on the characteristics of multi-loop transmission lines on the same tower, this paper analyses the related parameters of the operation equipment of multi-loop transmission lines on the same tower, carries out safety evaluation, risk analysis and field strength analysis on the surface of the staff for live operation, and puts forward relevant protective measures to complete the feasibility analysis of live operation on multi-loop transmission lines on the same tower.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7