作 者:邓志翔[1] DENG Zhixiang(China Railway Siyuan Survey and Design Group Co.,Ltd.,430063,Wuhan,China)
机构地区:[1]中铁第四勘察设计院集团有限公司
出 处:《城市轨道交通研究》2019年第12期89-91,95,共4页Urban Mass Transit
摘 要:市域轨道交通中的交流供电制式[1],虽具有供电区间较长及建设成本较低等优势,但却带来了电分相(无电区)的问题。基于电分相区域的构成,分析了在最不利情况下列车通过电分相区域需要惰行的最长距离。通过理论计算,明确了信号系统在ATO(列车自动运行)控车的情况下列车进入电分相区域入口的最低速度,从而确定了电分相两侧信号机的布点原则、设置电分相的最小站间距长度及所处节能坡的区段位置。The AC power supply system in urban rail transit has the advantages of long power supply interval and low construction cost.However,it also creates the problem of phase separation(in non-power area).According to the composition of phase separation area,the longest phase separation distance that a train needs to idle through in the worst condition is analyzed.Through theoretical calculation,the lowest speed of signal system under ATO(automatic train operation)control is defined when a train enters the phase separation area,thus the distribution principle of signal machines on both sides of the phase separation area,the minimum station spacing length and the location of energy-saving slope are formulated in setting the phase separation.
关 键 词:市域轨道交通 交流供电 电分相 信号系统 节能坡
分 类 号:U239.58[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28