作 者:陈利民 CHEN Limin(Shanghai Donghua Local Railway Development Co.Ltd.,Shanghai 200071,China)
机构地区:[1]上海东华地方铁路开发有限公司
出 处:《铁道建筑》2020年第1期62-65,88,共5页Railway Engineering
摘 要:上海地铁15号线盾构隧道下穿上海南站咽喉区。通过方案比选、下穿工程影响数值模拟,形成了综合考虑施工条件和对车站咽喉区影响的线路方案。根据咽喉区列车通过能力,制定了列车限速和运营调整方案。制定地层斜向注浆加固方案,采用高性能全新土压平衡盾构机和新型相对质量密度大的单液浆减少车站咽喉区地表变形,并采用自动化连续监测和实时反馈的信息化施工方法。该技术措施将下穿咽喉区盾构施工中地表沉降控制在4.5 mm以下,可供类似工程参考。The shield tunnel of Shanghai Metro Line No.15 under-crosses the throat area of Shanghai south railway station.Through the comparison and selection of schemes and the numerical simulation of the influence of undercrossing engineering,a line scheme was formed to balance the construction conditions and reduce the impact on the throat area of the station.According to the passing capacity of the train in the throat area,the train speed limit and operation adjustment scheme were formulated.The inclined grouting reinforcement scheme was drawn up,a new highperformance earth pressure balance shield machine and a new type of single liquid slurry with high relative mass density were used to reduce the ground surface deformation in the throat area of the station,and the information construction method of automatic continuous monitoring and real-time feedback was adopted.This technical measure can control the ground settlement below 4.5 mm during the shield construction undercrossing the throat area,which can be used as a reference for similar projects.
关 键 词:地铁施工 盾构 现场试验 沉降变形 车站咽喉区 注浆加固 信息化施工
分 类 号:TU9[建筑科学] U25[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.148