重载铁路黏土包砂路基填筑施工技术  

Construction Technology of Clay Sand Subgrade Filling for Heavy Haul Railway

在线阅读下载全文

作  者:周伍艺 ZHOU Wu-yi(The China Railway No.3 Engineering Group Corporation the Fifth Limited Company,Jinzhong 030600,China)

机构地区:[1]中铁三局集团第五工程有限公司

出  处:《工程建设与设计》2020年第3期169-171,共3页Construction & Design for Engineering

摘  要:新建蒙华铁路24合同段地处长江中下游江汉平原,铁路路基C组填料来源不广泛,结合施工区域粉砂夹粉质黏土以及细砂较丰富的情况,提出了黏土包砂填料替代传统C组填料施工的方法。论文详细介绍了重载铁路黏土包砂路基填筑关键工艺,可为类似工程施工提供一定的借鉴和指导。The 24 contract section of the newly built Menghua railway is located in Jianghan Plain in the middle and lower reaches of the Yangtze River, and the source of group C filling materials for railway subgrade is not extensive. Combined with the rich situation of silty sand mixed with silty clay and fine sand in the construction area, the construction method of replacing the traditional group C filling materials with clay packed with sand is proposed. This paper introduces in detail the key technology of clay sand subgrade filling for heavy haul railway, which can provide some reference and guidance for similar engineering construction.

关 键 词:重载铁路 路基填筑 黏土包砂 施工技术 

分 类 号:U216.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象