斜拉型拆卸回收锚索在洛阳地铁工程中的应用  

The Application of Cable-Stayed Disassembly Recovery Anchor Cable in Luoyang Subway Project

在线阅读下载全文

作  者:梁宁 张洪欣 LIANG Ning;ZHANG Hong-xin(Institute of Henan Bureau of Geological Exploration and Mineral Third Institute of Geological,Luoyang 471023,China;Henan Province Metal Mineral Deep Hole Drilling Engineering Technology Research Center,Zhengzhou 450016,China)

机构地区:[1]河南省地矿局第三地质勘查院,河南洛阳471023 [2]河南省金属矿产深孔钻探工程技术研究中心,郑州450016

出  处:《工程建设与设计》2020年第4期100-101,共2页Construction & Design for Engineering

摘  要:洛阳市城市轨道交通1号线工程牡丹广场站位于西苑路牡丹广场内,是地铁1和3号线的平行换乘站,周边环境复杂。综合分析各类型可回收锚索的工艺,对20个出入口部位采用斜拉型拆卸回收锚索工艺技术,顺利实施并取得了较好的回收率。Peony plaza station,line 1 of urban rail transit project of Luoyang city,is located in peony plaza of Xiyuan road.It is the parallel transfer station of subway line 1 and line 3,with complicated surroundings.Based on the comprehensive analysis of the technology of various types of recyclable anchor cables,the technology of cable-stayed disassembly recovery anchor cable for 20 inlet and outlet parts was carried out successfully and a good recovery rate was obtained..

关 键 词:地铁工程 斜拉型拆卸回收锚索 回收率 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 