检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈晨 潘灵敏 宋恒东 鲍奕 吴伟 CHEN Chen;PAN Lingmin;SONG Hengdong;BAO Yi;WU Wei(Maintenance Branch of State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 211102)
机构地区:[1]国网江苏省电力有限公司检修分公司,江苏南京211102
出 处:《电力安全技术》2020年第4期54-57,共4页Electric Safety Technology
摘 要:针对500 kV紧凑型线路导线布局紧凑,塔头尺寸甚小,上相等电位带电作业开展困难的局面,探讨了地电位带电更换的方式,并研制了配套的操作杆、提线器及相关专用卡具。现场实际应用表明,采用地电位更换方式和所研制的配套工器具能够安全、高效地完成紧凑型线路直线塔上相绝缘子串的更换工作,给类似工作的开展提供了借鉴。In view of the fact that the conductor layout of 500 kV compact line is of compact size,the size of tower head is very small,and it is difficult to carry out iso-potential live work,this paper discusses the way of ground potential live replacement,and develops the matched operating pole,wire lifter and relevant special clamps.The field application shows that the replacement of phase insulator strings on the compact line tower can be completed safely and efficiently by using the ground potential replacement method and the developed supporting tools and equipment,which provides a reference for similar work.
分 类 号:TM726.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.36.157