检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟伟 崔学良 纪娟 高雅 Zhong Wei;Cui Xueliang;Ji Juan;Gao Ya(Power Dekor Group Co.Ltd.,Danyang,Jiangsu 212310,China;Dare(Jiangsu)Flooring Co.Ltd.,Danyang,Jiangsu 212300,China)
机构地区:[1]圣象集团有限公司,江苏丹阳212310 [2]大亚(江苏)地板有限公司,江苏丹阳212310
出 处:《中国人造板》2020年第6期29-32,共4页China Wood-Based Panels
摘 要:以脲醛树脂热压粉状胶为胶黏剂,以栎木和赛鞋木豆两种单板为研究对象,探讨了三层实木复合地板表板横拼胶合工艺中热压温度和加压时间的选择。结果表明,在本实验条件下推荐热压温度(108±3)℃时,栎木表板热压时间37 s,赛鞋木豆热压时间36 s;热压温度(103±3)℃时,栎木41 s,赛鞋木豆的热压时间37 s;热压温度(98±3)℃时,栎木48 s,赛鞋木豆44 s。The hot pressing temperature and pressing time in the splicing process of surface board of three-layer engineering flooring with urea formaldehyde resin were discussed.The results showed that under the hot pressing temperature (108±3) ℃,the recommended hot pressing time of oak veneer was 37 s,that of Awoura zingana was 36 s;when the hot pressing temperature was (103±3) ℃,the recommended hot pressing time of oak was 41 s,that of Awoura zingana was 37 s;when the hot pressing temperature was (98±3) ℃,the recommended hot pressing time oak was 48 s,that of Awoura zingana was 44 s.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.189.143