检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄绘[1]
出 处:《科技创新与应用》2020年第20期133-134,共2页Technology Innovation and Application
摘 要:接触线和承力索新线初伸长是蠕变伸长和形变伸长的综合体现,会对接触网下锚端和悬挂设备产生影响,因此提出额定张力张拉和超拉的方法解决此问题,多采用超拉。超拉分机械超拉和增加坠砣超拉两种方式。我国使用增加坠砣超拉方式,按照"加固-超拉-调整"的步骤进行。The initial elongation of contact wire and new load-bearing cable is the comprehensive embodiment of creep elongation and deformation elongation,which will affect the anchor end and suspension equipment under the catenary,so the methods of rated-tension stretch and overstretch are put forward to solve this problem.There are two ways of overdrawing:mechanical overstretch and adding weight overstretch.In our country,the overstretch method of adding weight is used,which is carried out according to the steps of"reinforcement-overstretch-adjustment".
分 类 号:U225.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.2.199