检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张远明 宋明 ZHANG Yuanming;SONG Ming(CCCC Second Highway Consultant Co.,Ltd.,Wuhan 430056,China)
机构地区:[1]中交第二公路勘察设计研究院有限公司,武汉430056
出 处:《低温建筑技术》2020年第5期87-90,100,共5页Low Temperature Architecture Technology
摘 要:以一大直径盾构隧道下穿地铁车站工程为背景,研究盾构掘进施工对车站结构变形的影响情况。通过建立结构-土体三维有限元模型模拟盾构施工过程,分析车站结构的变形、抗拔桩的位移,以及周围土体的位移变化。结果表明盾构施工对地铁结构变形和抗拔桩位移的影响均较小;车站正下方区域外的施工引起的结构底板和抗拔桩竖向位移影响有限。Taking a large-diameter shield tunnel project under the subway station as the case,the influence of shield tunneling construction on the deformation of the station structure was studied.A three-dimensional finite element model was established to simulate the shield construction process,in which theuplift piles displacement,the structure deformation,and the surrounding soil deformationwere analyzed.The results show that the effects of shield construction on the deformation of the subway structure and the displacement of the uplift piles are small,in addition,the effect of the vertical displacement of the structural floor and the uplift piles caused by the construction outside the station area is limited.
分 类 号:TU94[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3