检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙韬 SUN Tao(China Railway 22nd Bureau Group Electrification Engineering Co.Ltd.,Beijing 102300,China)
机构地区:[1]中铁二十二局集团电气化工程有限公司,北京102300
出 处:《工程建设与设计》2020年第13期221-222,共2页Construction & Design for Engineering
摘 要:分析铁路工程施工总承包投标报价中综合评估法的运用,对该方法进行介绍,明确其在获取施工总承包权中的价值,介绍当前综合评估法的应用现状,并从优化设计评估指标、科学设定评估指标权重、合理设定评标基准价3个方面,介绍综合评估法在投标报价中的运用,有利于提高中标概率,以期为今后招投标环节提供有价值的参考。This paper analyzes the application of the comprehensive evaluation method in the tender offer of the general contract of railway engineering construction,introduces the method,clarifies its value in obtaining the general contract right of construction,and introduces the current application status of the comprehensive evaluation method.And from three aspects of optimizing design evaluation index,scientifically setting evaluation index weight and reasonably setting evaluation benchmark price,this paper introduces the application of comprehensive evaluation method in bidding quotation,which is conducive to improving the probability of winning the bid,in order to provide valuable reference for the future bidding process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15