隔离桩对盾构掘进引起邻近高铁桩基水平位移的影响分析  被引量:21

Analysis on the influence of isolation pile on horizontal displacement of adjacent pile under high-speed railway caused by shield driving

在线阅读下载全文

作  者:冯国辉 周逊泉 何庆亮 徐长节[1,4] Feng Guohui;Zhou Xunquan;He Qingliang;Xu Changjie(Research Center of Coastal and Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310058,P.R.China;Zhejiang Hanghai Intercity Railway Co.,Ltd.,Jiaxing 314000,Zhejiang,P.R.China;Hangzhou CBD Construction Development Co.,Ltd.,Hangzhou 310020,P.R.China;Jiangxi Key Laboratory of Infrastructure Safety Control in Geotechnical Engineering,Engineering Research&Development Centre for Underground Technology of Jiangxi Province,East China Jiaotong University,Nanchang 330013,P.R.China)

机构地区:[1]浙江大学滨海和城市岩土工程研究中心,杭州310058 [2]浙江杭海城际铁路有限公司,浙江嘉兴314000 [3]杭州市钱江新城建设开发有限公司,杭州310020 [4]华东交通大学江西省岩土工程基础设施安全与控制重点实验室,江西省地下空间技术开发工程研究中心,南昌330013

出  处:《土木与环境工程学报(中英文)》2020年第4期28-35,共8页Journal of Civil and Environmental Engineering

基  金:国家重点基础研究发展计划(973计划)(2015CB057801);国家杰出青年基金(51725802);国家自然科学基金(51878276);浙江省自然科学基金委员会-华东院联合基金(LHZ19E080001)。

摘  要:在城市建设过程中,盾构隧道开挖对邻近既有高铁桩基产生较大威胁,在隧道和高铁桩基之间打入隔离桩可以有效减小盾构掘进对高铁桩基的影响。在研究桩土相互作用领域中,Winkler地基模型和Pasternak地基模型得到了广泛的运用。基于这两种地基模型,采用差分法,利用Maple数学运算软件对某实际工程案例分析,将计算结果与已有工程监测数据进行对比验证,并深入分析隔离桩各项参数对高铁桩水平位移的影响。结果表明,当隔离桩弹性模量较小时,Pasternak地基模型计算结果比Winkler地基模型更加精准;随着隔离桩桩径的增大,高铁桩基水平位移显著减小;在隔离桩桩体参数不变的条件下,缩短隔离桩与隧道中心线的水平距离能减小高铁桩基的水平位移。In the process of urban construction,shield tunnel excavation will pose a great threat to the adjacent existing pile under high-speed railway.Driving isolation pile between the tunnel and high-speed railway foundation pile can effectively reduce the influence of the shield driving to adjacent pile foundation.In the field of pile-soil interaction,Winkler foundation model and Pasternak foundation model have been widely used.Based on these two foundation models,this paper uses the finite difference method by Maple mathematical software to analyse a practical engineering case.The calculated results are in accordance with existing engineering monitoring data.Then the influences of isolation pile of various parameters on the horizontal displacement of the pile under high-speed railway are further analyzed.The results show that Pasternak foundation model is more accurate than Winkler foundation model when the elastic modulus of isolation pile is smaller.With the increase of isolated pile diameter,the horizontal displacement of pile foundation will decrease significantly.The horizontal displacement of high-speed railway pile foundation can be reduced by reducing the horizontal distance between the isolated pile and the tunnel center line on the condition that the parameters of isolated pile remain unchanged.

关 键 词:地基模型 盾构隧道 桩土相互作用 邻近开挖 隔离桩 位移 

分 类 号:TU433[建筑科学—岩土工程] U213.1[建筑科学—土工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象