检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑学召 姜鹏 刘会林[2] 吴文彤 ZHENG Xuezhao;JIANG Peng;LIU Huilin;WU Wentong(School of Safety Science and Engineering,Xi’an University of Science and Technology,710054,Xi'an,China;不详)
机构地区:[1]西安科技大学安全科学与工程学院,西安710054 [2]中铁十六局集团有限公司,北京100018 [3]中煤科工集团常州研究院有限公司,常州213015
出 处:《城市轨道交通研究》2020年第9期56-60,共5页Urban Mass Transit
基 金:国家重点研发计划重点专项项目(2018YFC0808201);陕西省自然基金资助项目(2018JM5009)。
摘 要:针对西安某地铁隧道施工风险,对多指标人-机-环系统综合评价进行了探讨。在分析人员安全风险、机械设备安全风险、环境风险的基础上,结合模糊层次分析法,提出了一种新型的综合评价体系。该体系采用了梯形模糊层次分析法,来处理地铁隧道施工风险因素影响的不精确性和不确定性;并从人员安全风险因素、机械安全风险因素、环境风险因素三个方面建立了指标体系,通过建立成对比较矩阵以及计算指标权重,得出了模糊评价向量,从而将地铁隧道施工风险等级划分为不安全、较不安全、一般安全、较安全、很安全等5类,进而确定地铁隧道施工风险等级。梯形模糊层次分析具有较强的工程适用性,是评估地铁隧道施工风险的一种有效方法。基于该方法得到的地铁隧道施工风险等级,可为提高地铁隧道施工安全提供可靠的理论依据。In view of a metro tunnel construction risk in Xi’an City,the comprehensive evaluation of multi-index man-machine-environment system is discussed.Based on an analysis of personnel safety risk,mechanical equipment safety risk and environmental risk,and combined with fuzzy analytic hierarchy method,a new comprehensive evaluation system is proposed.The system uses trapezoidal fuzzy analytic hierarchy method to deal with the inaccuracy and uncertainty of the influences caused by risk factors during metro tunnel construction.Then,the index system is established from personnel safety risk factors,mechanical safety risk factors and environmental risk factorsthree aspects.By setting up a pairwise comparison matrix and the calculation index weight,a fuzzy evaluation vector is obtained,which categorizes the metro tunnel construction risks into five levels:unsafe,relatively unsafe,generally safe,relatively safe,and highly safe,and furthermore determines the risk level of metro tunnel construction.Due to the strong engineering applicability,the trapezoidal fuzzy analytic hierarchy method is an effective method to evaluate the construction risk of metro tunnels.The metro tunnelconstruction risk level obtained from this method can provide a reliable theoretical basis for improving the safety of metro tunnel construction.
分 类 号:TU714[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28