调整盐田走水路线的体会  被引量:1

Experience of Adjusting the Route of Salt Pond’s Brine Supplying System

在线阅读下载全文

作  者:王绪书[1] 张心禄[1] WANG Xu-shu;ZHANG Xin-lu(Tianjin Changlu Haijing Group Co.,Ltd.,Tianjin 300450,China)

机构地区:[1]天津长芦海晶集团有限公司,天津300450

出  处:《盐科学与化工》2020年第10期37-39,共3页Journal of Salt Science and Chemical Industry

摘  要:成熟盐田开展大型走水路线调整和技术改造通常情况下是一个比较漫长的过程,一般改造和调整需要2 a^3 a时间,检验效果则需更长的时间。文章就2005年天津长芦海晶集团有限公司盐田走水路线调整过程进行分析,归纳总结调整思路,为技术人员在盐田走水路线调整和技术改造时提供技术依据和参考。It is a long-term task to modify the brine supplying system on the integrated salt pond.The modification time usually needs 2 to 3 years and the effect of the modification may be obtained after several years.In this article,we analyzed the salt pond's brine supplying system modification which is taken in 2005,and summarized the adjusted the system.It provided technical basis and reference for technical personnel in salt pond's brine supplying system adjustment and technical transformation.

关 键 词:走水路线 蒸结比 生产能力 

分 类 号:TS343[轻工技术与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象