检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘松杰 吕擎峰[1] 赵彦旭[1] 李策策 PAN Songjie;LUY Qingfeng;ZHAO Yanxu;LI Cece(Key Laboratory of Mechanics on Disaster and Environment in Western China(Lanzhou University),Lanzhou 730000,China;China Railway 21st Bureau Group Co.,Ltd.,Lanzhou 730050,China)
机构地区:[1]兰州大学西部灾害与环境力学教育部重点实验室,兰州730000 [2]中铁建二十一局集团有限公司,兰州730050
出 处:《路基工程》2020年第5期1-5,共5页Subgrade Engineering
基 金:甘肃省重点研发项目(18YF1FA112);中铁建科技研究开发计划(16-C36)。
摘 要:运用FLAC3D内置FISH语言编程实现列车荷载的施加,分析了两种黄土路堤结构在动荷载下的响应特征,并探讨桩板结构桩间距对路堤动力响应的影响。结果表明:桩板结构路堤各层的竖向位移均比无桩板结构的大;两种模型的动应力均沿线路横向呈马鞍型不均匀分布,轨下位置处动应力最大,桩板结构路堤峰值动应力比无桩板结构的大;桩间距为4 m时,基床表层表面位移最大,桩间距为3,2 m时,基床表层位移基本一致,并且比4 m时小,桩间距在2~3 m时基床表层表面位移较小。通过模拟结果发现,无桩板结构路堤动力响应比桩板结构路堤的小,在不考虑别的因素条件下,采用无桩板填土路堤结构较为合理。In virtue of programming in FLAC3D built in FISH language to apply train load,the response characteristics of two loess embankment structures under dynamic load were analyzed,and the effect of pile spacing in pile-slab structure on the dynamic response of embankment was discussed.The result shows that,the vertical displacement of each layer of the embankment in pile-slab structure is greater than that free of pile-slab structure;the dynamic stress of the both models present saddle-shaped uneven distribution laterally along the line,and the dynamic stress beneath the rail is maximum,the peak dynamic stress of the embankment in pile-slab structure is greater than that free of pile-slab structure;where the pile spacing is 4 m,the surface displacement of the surface layer of subgrade bed is maximum,where the pile spacing is 3 m or 2 m,the displacement thereof is substantially the same and less than that in the case of 4 m and,where the pile spacing is 2~3 m,the displacement thereof is minor.Depending on the simulation result,it is found out that the embankment free of pile-slab structure has smaller dynamic response than that of the embankment in pile-slab structure,therefore,it is reasonable to adopt the embankment structure filled without pile-slab,providing no other factors are considered.
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.102.192