检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段刚强[1] 倪华军 姜港 DUAN Gangqiang;NI Huajun;JIANG Gang(Sinohydro Bureau 7 Co.,LTD,Chengdu,Sichuan,610213)
机构地区:[1]中国水利水电第七工程局有限公司,四川成都610213
出 处:《四川水力发电》2020年第5期45-48,53,共5页Sichuan Hydropower
摘 要:阐述了为解决白鹤滩水电站左岸100 m级高门槽二期混凝土施工的难题,对传统施工排架+组合模板方案、整体提升模板方案及滑模方案进行创新设计出悬吊式滑模系统,该系统具有安全可靠、可视化操作、适用性强、施工效率和周转使用率高等优点。对门槽二期混凝土悬吊式滑模系统的设计与应用情况等进行了总结和提炼,旨在为同类工程施工提供参考。In order to solve the problem of phase Ⅱ concrete construction of 100 mhigh gate slot on the left bank of Baihetan Hydropower Station,the traditional bent frame + combined formwork scheme,integral lifting formwork scheme and slip form scheme are innovated,and the suspended slip form system is designed.The system has the advantages of safety and reliability,visual operation,strong applicability,high construction efficiency and turnover utilization rate.This paper summarizes and refines the design and application of the suspended slip form system of the stage Ⅱ concrete of the gate slot,so as to provide reference for the construction of similar projects.
关 键 词:悬吊式滑模系统 整体提升模板 组合模板 滑模 白鹤滩水电站
分 类 号:TV7[水利工程—水利水电工程] TV52
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.157.170