检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷丽萍 LEI Liping(Powerchina Northwest Engineering Corporation Limited, Xi'an 710065,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《西北水电》2020年第5期21-23,共3页Northwest Hydropower
摘 要:结合黄河上游龙羊峡、李家峡、公伯峡水库运行期水库水温实测资料,分析了龙羊峡水库单库蓄水运行和大型梯级水库联合运行后对下游河道水温的影响,对多年调节型水库和坝高大于100 m的日调节水库对下游河道水温的调节作用进行了分析总结,对高坝大库水库水温分析具有一定参考价值。Combining the data of the water temperature measured during the operation of the Longyangxia,Lijiaxia and Gongboxia reservoirs in the upper reaches of the Yellow River,this paper analyzes the impact of the single storage operation of the Longyangxia Reservoir and the combined operation of large-scale cascade reservoirs on the water temperature of the downstream river.The paper analyzes and summarizes the regulating effect of the multi-year regulating reservoir and daily regulating reservoir with a dam height over 100 m on the downstream river water temperature,which has certain reference value for the water temperature analysis of high dam reservoirs.
分 类 号:TV697.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3