检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郝将 Hao Jiang
机构地区:[1]中铁十二局第四集团有限公司,西安710000
出 处:《建筑技术开发》2020年第19期94-95,共2页Building Technology Development
摘 要:墩帽作为桥墩的主要组成部分,在桥墩的承重中起承上启下的作用。目前常规的高铁墩帽整体切除、重新浇筑混凝土方案存在施工效率低、成本高等问题。以南龙铁路洋丹仔大桥桥墩为研究对象,对其墩帽的施工进行研究,从施工过程中总结出较为完善的工艺条件,以期为类似工程的施工起到借鉴作用。As the main part of the pier cap,the pier cap plays a connecting role in the bearing of the pier. At present,the conventional high-speed railway pier cap overall removal and concrete reconstruction scheme has the problems of low construction efficiency and high cost. This paper takes yangdanzai bridge pier of Nanlong railway as the research object. Construction of pier cap was studied,and the relatively perfect process conditions from the construction process was summarized,in order to play a reference role for the construction of similar projects.
分 类 号:TU745[建筑科学—建筑技术科学] U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145