检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张小会[1,2] 张泽宇 狄宏规[1,2] 何超[1,2] ZHANG Xiaohui;ZHANG Zeyu;DI Honggui;HE Chao(Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China;Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety,Tongji University,Shanghai 201804,China)
机构地区:[1]同济大学道路与交通工程教育部重点实验室,上海201804 [2]同济大学上海市轨道交通结构耐久与系统安全重点实验室,上海201804
出 处:《同济大学学报(自然科学版)》2021年第1期67-75,共9页Journal of Tongji University:Natural Science
基 金:国家自然科学基金(5171101316)。
摘 要:为研究地铁车辆通过浮置板轨道过渡段时隧道和土体的动力响应规律,提出了时域高效计算的隧道-饱和土体半解析环状层单元,结合车辆-轨道动力学,建立了车辆-浮置板轨道过渡段-隧道-土体系统耦合动力计算方法,研究了浮置板轨道过渡段长度、钢弹簧刚度等参数对隧道振动加速度、土体正应力和孔隙水压力的影响。结果表明,过渡段参数设计需重点关注2个刚度突变位置的动力响应,采用钢弹簧刚度渐变方案时,3个动力响应指标分别降低60%、15%和25%。To study the dynamic response of the tunnel and soil when the subway train passes the transition section of the floating slab track,this paper proposed a semi-analytical ring layered element for the efficient calculation of the tunnel-saturated soil vibration in time domain.Taking into consideration of the train-track model,the coupled dynamic model of the train-floating slab track transition section-tunnel-soil system was finally established.The effects of the parameters of the floating slab transition section(i.e.,the length and the stiffness of the steel spring)on the tunnel acceleration,soil normal stress and pore water pressure were studied.The results show that the parameter design of the floating slab track transition section needs to focus the dynamic responses at the two positions of sudden changes in stiffness of the transition section.The scheme of the gradient in steel spring stiffness can reduce the three evaluation indexes of the dynamic response by 60%,15%and 25%respectively.
分 类 号:U211.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.130.198