检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHANG Ming ZHU Jianjun WANG Hehua
机构地区:[1]College of Economics and Management,Nanjing University of Aeronautics and Astronautics,Nanjing 211106,China [2]School of Business,Jinling Institute of Technology,Nanjing 211169,China
出 处:《Journal of Systems Engineering and Electronics》2021年第1期136-150,共15页系统工程与电子技术(英文版)
基 金:supported by the National Natural Science Foundation of China(71171112;71502073)。
摘 要:This paper analyzes a problem processing mechanism in a new collaboration system between the main manufacturer and the supplier in the"main manufacturer-supplier"mode,which has been widely applied in the collaborative development management of the complex product.This paper adopts the collaboration theory,the evolutionary game theory and numerical simulation to analyze the decision-making mechanism where one upstream supplier and one downstream manufacturer must process an unpredicted problem without any advance contract in common.Results show that both players'decision-makings are in some correlation with the initial state,income impact coefficients,and dealing cost.It is worth noting that only the initial state influences the final decision,while income impact coefficients and dealing cost just influence the decision process.This paper shows reasonable and practical suggestions for the manufacturer and supplier in a new collaboration system for the first time and is dedicated to the managerial implications on reducing risks of processing problems.
关 键 词:collaborative development management unpredicted problem problem processing mechanism evolutionary game theory
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222