检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭胜辉 李程 张健 李义仓[2] 才华 鲍磊 杨兰均[1] GUO Shenghui;LI Cheng;ZHANG Jian;LI Yicang;CAI Hua;BAO Lei;YANG Lanjun(School of Electrical Engineering,Xi’an Jiaotong University,Xi’an 710049,China;State Grid Hanzhong Electric Power Company,Shaanxi Hanzhong 723000,China;Shaanxi Electric Power Research Institute,Xi’an 710054,China)
机构地区:[1]西安交通大学电气工程学院,西安710049 [2]国网汉中供电公司,陕西汉中723000 [3]国网陕西电力科学研究院,西安710054
出 处:《电力电容器与无功补偿》2021年第1期45-50,共6页Power Capacitor & Reactive Power Compensation
摘 要:近年来,串联补偿装置在配电网中有了更多的应用,需要研究串联补偿装置在配电网中的配置方案,满足配电网在多种状态下的运行需求。但是配电网的负荷是存在较大波动,电力企业希望能在串联补偿装置可以在配电网不同负荷状态下实现降损和改善线路低电压问题。为此,本文建立一种综合考虑配电网负荷运行状态的多目标优化模型,以线损率和电压偏离度为优化目标,进而通过NSGA Ⅱ算法获得帕累托前沿。再用逼近理想解排序法从帕累托解集中获得任意负载率下的优化结果,对于所有负载率下的优化结果进行配电网年度潮流计算,选取线损率最低的为最终的优化方案。最后在34节点配电网算例中对模型和算法进行验证和分析,并说明了计算结果的鲁棒性。In recent years,series compensation device has found more and more application in the distribution network. It is necessary to study the configuration scheme of the series compensation device in the distribution network so to meet the operational requirements of the distribution network in various conditions.However,the load on the distribution network has large fluctuations. Power utilities hope the series compensation device can achieve both loss reduction and low voltage improvement of line at different load conditions of the distribution network. To this end,a kind of mufti-objective optimization model with comprehensive consideration of load operation condition of distribution network is set up in this paper. The line loss rate and voltage deviation are taken as the optimization goal,thereby obtaining the Pareto frontier by NSGA Ⅱ algorithm. Then,the optimization results under arbitrary load rate are obtained from the Pareto solution set by TOPSIS method. The annual power flow calculation of the distribution network is performed for the optimization results under all load rates and the lowest line loss rate is selected as the final optimization scheme. Finally,the model and algorithm are verified and analyzed in the 34-node distribution network example and the robustness of the calculation results is illustrated.
关 键 词:配电网 串联补偿装置 动态负荷 鲁棒 多目标优化 NSGAⅡ
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.105.161