检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万小飞[1] 高振 Wan Xiaofei;Gao Zhen(Beijing Metro Construction Administration Co.,Ltd.,100068,China;China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,WuHan 430050,China)
机构地区:[1]北京市轨道交通建设管理有限公司,100068 [2]中铁大桥勘测设计院有限公司,武汉430050
出 处:《特种结构》2021年第1期97-101,123,共6页Special Structures
摘 要:北京地铁七号线富水砂层盾构区间联络通道利用冻结法加固土体顺利完成施工,本文详细介绍了冻结法设计、施工以及信息化监测技术,为北京地铁联络通道水平冻结施工提供了参考依据。本工程的成功经验可供其他相似工程参考。The freezing ground method was used to successfully complete the construction of the connecting passage of the Beijing Metro Line 7 shield tunnel in a water-rich sandy stratum.The design,construction,and information monitoring technology of the freezing method in this project are introduced in detail in this paper.This study provides a reference for the horizontal freezing construction of the Beijing subway connecting passage.The successful experience of this project can also be used as a reference for other similar projects.
分 类 号:U231.3[交通运输工程—道路与铁道工程] U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15