检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李政发 Li Zheng-fa
机构地区:[1]中铁十二局集团第四工程有限公司,西安710016
出 处:《建筑技术开发》2021年第5期61-62,共2页Building Technology Development
摘 要:节段拼装制梁是利用移动支架造桥机在墩顶组拼预制梁段,原位张拉成桥,先"化整为零"后"化零为整"的一种施工方法。以蒙华铁路汾河特大桥64 m节段拼装简支箱梁施工为背景,详细介绍了重载铁路64 m节段拼装简支箱梁分批张拉方案的对比选择和施工技术,可供同类结构施工参考借鉴。Simply-supported beam is a construction method in which the mobile support bridge building machine is used to assemble the precast beam section at the top of pier,and the bridge is formed by in-situ tensioning,and the bridge is first divided into parts and then divided into parts.Based on the construction of 64 m section of Fenhe Extra-large Bridge of Menghua Railway,this paper introduces in detail the comparison and selection of batch tensioning scheme and construction technology of 64 m section of assembled simply supported box girder,which can be used for reference in the construction of similar structures.
分 类 号:TU71[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.0.68