检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋丽忠[1,2] 冯玉林 周旺保[1,2] 聂磊鑫 向平 周文[1] JIANG Lizhong;FENG Yulin;ZHOU Wangbao;NIE Leixin;XIANG Ping;ZHOU Wen(School of Civil Engineering,Central South University,Changsha 410075,China;National Engineering Laboratory for High Speed Railway Construction,Central South University,Changsha 410075,China)
机构地区:[1]中南大学土木工程学院,湖南长沙410075 [2]中南大学高速铁路建造技术国家工程实验室,湖南长沙410075
出 处:《建筑结构学报》2021年第4期215-222,共8页Journal of Building Structures
基 金:国家自然科学基金项目(51408449,51778630,U1934207);湖南创新型省份建设专项经费资助项目(2019RS3009)。
摘 要:为研究高速铁路桥梁结构横向变形与轨面变形间的映射关系,在考虑高速铁路桥梁-路基-无砟轨道系统层间相互作用的基础上,基于势能驻值原理,推导出连续梁桥横向变形与轨面变形的微分方程及边界条件,提出连续梁桥横向变形与轨面变形的映射解析模型。利用所提的解析方法及有限元方法分别求解连续梁桥横向变形下的钢轨变形,并研究横向变形幅值不确定性对轨面变形的影响。结果表明:两种方法求解结果吻合良好,验证了所提的解析模型的正确性;桥梁结构变形与轨面变形的映射系数随桥梁结构变形幅值的增加而非线性增大;钢轨变形具有明显的"跟随性";钢轨变形及层间扣件内力随连续梁桥变形幅值的增大而增大;列车运行速度越快,钢轨变形引起的激励频率越大。The mapping relationship between bridge structure transverse deformation and rail deformation of high-speed railway was studied. Based on the potential energy principle, differential equations and boundary conditions of continuous girder bridge transverse deformation and rail deformation were derived, and a mapping analytical model of continuous girder bridge transverse deformation and rail deformation was proposed considering the interaction between layers of bridge-subgrade-ballastless track system of high-speed railway. Analytical and finite element methods were used to solve the rail deformation under continuous girder bridge transverse deformation, and the influence of the uncertainty of transverse deformation amplitude on rail deformation was revealed. The results show that the two methods are in good agreement with each other, which proves the correctness of the analytical model. The mapping coefficient between bridge deformation and rail deformation increases nonlinearly with the increase of the deformation amplitude of continuous girder bridge. The rail deformation has obvious ‘following features’. The rail deformation and fastenings internal force increase with the increase of the deformation amplitude of continuous girder bridge. The faster the train runs, the greater the excitation frequency caused by rail deformation.
关 键 词:高速铁路连续梁桥 钢轨变形 解析模型 势能驻值原理 映射关系
分 类 号:U44[建筑科学—桥梁与隧道工程] TU311.41[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.198.133