检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑晶 温玉维 李小雁 卢召艳 Zheng Jing;Wen Yuwei;Li Xiaoyan;Lu Zhaoyan(China Energy Engineering Group Hunan Electric Power Design Institute Co.,Ltd.,Changsha 410007,China;Hunan Institute of Economic Geography,Hunan University of Finance and Economics,Changsha 410205,China)
机构地区:[1]中国能源建设集团湖南省电力设计院有限公司,湖南长沙410007 [2]湖南财政经济学院湖南省经济地理研究所,湖南长沙410205
出 处:《矿山测量》2021年第2期77-80,共4页Mine Surveying
摘 要:新建湘西某变电站工程工期紧、任务重。站址植被茂盛,交通不便,不利于传统测量手段进行数据采集。利用机载LiDAR技术对该站址进行初步测量。针对该技术在坡度较大地区精度较低的特点,采用普通航测手段进行修测。最终在较短时间内得到满足设计要求的DEM数据。Construction of the new substation had a tight schedule and heavy task in Xiangxi.Lush vegetation and the inconvenient transportation were not conducive to the traditional measurement methods for data collection in the station site.Airborne LiDAR was used to carry out the preliminary survey in the site.In view of the low accuracy of this technology in areas with the large slope,the ordinary aerial survey methods were used to carry out the correction measurement.Finally,DEM data meeting the design requirements was obtained in a short time.
分 类 号:P231[天文地球—摄影测量与遥感] P225[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49