作 者:令凡 吕国敏[1] 陈利雄[1] 朱李春[1] 李新凯 Ling Fan;LüGuomin;Chen Lixiong;Zhu Lichun;Li Xinkai(South China Sea Fisheries Research Institute,Chinese Academy of Fishery Sciences,Guangzhou 510300,China)
机构地区:[1]中国水产科学研究院南海水产研究所,广州510300
出 处:《黑龙江科学》2021年第10期162-164,共3页Heilongjiang Science
摘 要:本文对影响施工进度的各个因素和主要原因加以阐述和分析,并结合自身实践有针对性地提出以事前控制、动态管理为主的对策,对提高施工进度管理水平,确保建筑工程项目按时保质保量完工,促进施工进度管理更加科学化、规范化、制度化具有较大的意义。The article elaborates and analyzes the various factors and main reasons that affect the construction schedule,and combines its own practice to propose countermeasures based on prior control and dynamic management to improve the level of construction schedule management and ensure that construction projects are on time and quality and quantity.After completion,it is of great significance to promote more scientific,standardized and institutionalized construction schedule management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.146.8