基于Tennant法的塔里木河河道基流生态需水量计算  被引量:11

Calculation of ecological water demand for base flow of Tarim River based on Tennant method

在线阅读下载全文

作  者:贾小俊[1] JIA Xiaojun(Xinjiang Tarim River Basin Management Bureau, Korla 841000,China)

机构地区:[1]新疆塔里木河流域管理局,新疆库尔勒841000

出  处:《水利科学与寒区工程》2021年第3期49-53,共5页Hydro Science And Cold Zone Engineering

基  金:水利部公益性行业科研经费项目(201501059)。

摘  要:塔里木河水资源矛盾突出,为了确保塔里木河中游生态需水量,本文分析了塔里木河基本概况,以阿拉尔、英巴扎和恰拉水文站断面为研究对象,采用定额法对塔里木河中游河道水面蒸发进行了研究,采用Tennant法对塔里木河河道生态需水量进行计算,提出塔里木河干流阿拉尔、英巴扎和恰拉站河道生态需水量分别为13.58亿m^(3)、8.97亿m^(3)和3.16亿m^(3),该方法为生态基流分析计算提供了依据。In order to ensure the ecological water demand in the middle reaches of the Tarim River,this paper analyzes the basic situation of the Tarim River,taking the cross sections of the Alar Station,Yingbazha Station and Chara Hydrologic Station as the research object,the water surface evaporation of the middle reaches of the Tarim River is discussed by using the quota method,and the ecological water demand of the Tarim River is calculated by using the Tennant method,the results show that the ecological water demand of the main rivers in Tarim River is 13.58 million m^(3),897 million m^(3) and 316 million m^(3),respectively.

关 键 词:生态基流 TENNANT法 塔里木河中游 

分 类 号:X171[环境科学与工程—环境科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象