大型闸门双液压缸启闭机同步控制原理及调试  被引量:7

Synchronization Control Principle and Commissioning of Double Hydraulic Cylinder Hoist for Large Gate

在线阅读下载全文

作  者:王顶元 WANG Ding-yuan(Yunnan Water Investment Niulan River Barrier Lake Engineering Construction Co.,Ltd.,Zhaotong 657000,China)

机构地区:[1]云南水投牛栏江堰塞湖工程建设有限公司,云南昭通657000

出  处:《云南水力发电》2021年第7期184-187,共4页Yunnan Water Power

摘  要:为解决大型闸门双液压缸启闭机同步偏差不易控制的问题,以牛栏江红石岩堰塞湖整治工程溢洪洞弧形闸门液压启闭机为例,阐述了双液压缸启闭机同步控制原理及调试过程中同步偏差不易控制的原因及处理措施。实际运行结果表明,完成调试后的闸门启闭机运行平稳,同步精度较高、工作较为可靠,符合运行要求。In order to solve the problem that synchronization deviation of double hydraulic cylinder hoist for large gate is not easy to control,this paper takes Hongshiyan Barrier Lake Regulation Project of Niulan River as an example to elaborate the principle of synchronization control of double hydraulic cylinder hoist and the causes and treatment measures for synchronization deviation during commissioning.The actual operation results show that the gate hoist after commissioning runs smoothly,has high synchronization accuracy and works reliably,and meets the operation requirements.

关 键 词:双液压缸 系统原理 同步控制 调试 

分 类 号:TV734.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象