强震区隧道软弱围岩洞口段桩-筏抗震措施的作用效果分析  被引量:2

Analysis on the effect of pile-raft anti-seismic measures for the tunnel section of weak surrounding rock in strong earthquake area

在线阅读下载全文

作  者:崔光耀 李鹏宇 王庆建[2] CUI Guangyao;LI Pengyu;WANG Qingjian(School of Civil Engineering,North China University of Technology,Beijing 100144,China;China Railway Tunnel Group No.4 Co.Ltd.,Nanning,Guangxi 530000,China)

机构地区:[1]北方工业大学土木工程学院,北京100144 [2]中铁隧道集团四处有限公司,广西南宁530000

出  处:《中国地质灾害与防治学报》2021年第4期106-112,共7页The Chinese Journal of Geological Hazard and Control

基  金:国家自然科学基金项目(51408008);北京市青年拔尖人才培育计划项目(CIT&TCD201704013);北京市属高校基本科研业务费项目(110052971921/061)。

摘  要:为进一步提高地震时软弱围岩铁路隧道安全性及稳定性,以玉磨铁路新平隧道工程作为依托,利用FLAC3D数值模拟软件,对强震区隧道软弱围岩洞口段桩-筏抗震措施效果进行研究,对比分析了无加固措施、措施一(桩-拱结构)及措施二(桩-筏-拱结构)二衬的结构位移及内力,研究结果表明:措施一和措施二的竖向位移分别减小了1.35%、1.09%;措施一的边墙收敛几无变化(增大了0.44%);由于桩-筏-拱结构的整体稳定性较好,措施二的边墙收敛减小了30.49%;距离洞口最近的两个危险截面1和2处,措施一的最小安全系数提高了1.43%、 6.71%,措施二的最小安全系数提高了145.91%、143.72%;综合位移及内力分析,措施二的抗震效果优于措施一,建议新平隧道洞口段采用桩-筏-拱结构进行抗震加固。In order to further improve the safety and stability of railway tunnels with weak surrounding rocks during earthquake,the Xinping tunnel at Yumo Railway was taken as an example and,to study the effect of pile-raft seismic measures at the tunnel opening in soft surrounding rocks during strong earthquake using FLAC3D numerical simulation software.The structural displacement and internal force of the two linings without reinforcement were compared,the research results show that the vertical displacement of the pile-arch structure reduced 1.35%and that of the pile-raft-arch structure reduced 1.09%;the side wall convergence of the pile-arch structure has little change(increase 0.44%);due to the better overall stability of the pile-raft-arch structure,the side wall convergence of it is reduced by 30.49%;At the two dangerous sections closest to the entrance of the tunnel,the minimum safety factor of the pile-arch structure has been increased by 1.43%and 6.71%,and the minimum safety factor of the pile-raft-arch structure has been increased by 145.91%and 143.72%;The anti-seismic effect of the pile-raft-arch structure is better than that of the pile-arch structure.It is recommended that the pile-raft-arch structure should better be adopted for seismic reinforcement at the opening section of Xinping tunnel.

关 键 词:隧道工程 软弱围岩 洞口段 桩-拱结构 桩-筏-拱结构 地震稳定性 

分 类 号:P694[天文地球—地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象