作 者:李权[1] 谢斐[1] 吴盼盼 LI Quan;XIE Fei;WU Panpan(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2021年第8期55-57,共3页Hydropower and New Energy
摘 要:针对水布垭电站机组顶盖渗漏问题,通过逐一分析排查,确认顶盖渗漏的原因,结合顶盖结构特点,其组合面的密封条更换难度大,且密封条在此复杂环境中使用寿命的不确定性,更重要的是顶盖以后已经没有了分瓣检修的必要,所以采取对顶盖和止漏环封焊处理,消除了顶盖渗漏的隐患。The leakage problem of the unit head cover in Shuibuya Hydropower Station is analyzed.The primary cause of the problem is determined.Considering the structural characteristics of the head cover,the sealing ring of the combination plane is difficult to replace and its service life in such complex environment is of high uncertainty.Also,segmental maintenance will not be necessary for the head cover later.Thus,sealing welding is carried out on the head cover and the sealing ring to eliminate the leakage risk.
分 类 号:TK73[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15