检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李小彤 张万志 徐帮树 袁洋 李腾 LI Xiao-tong;ZHANG Wan-zhi;XU Bang-shu;YUAN Yang;LI Teng(School of Qilu Transportation, Shandong University, Jinan 250000, China;School of Transportation and Civil Engineering, Shandong Jiaotong University, Jinan 250357, China;China Railway fourteen Bureau Group Second Engineering Co., Ltd., Taian 271000, China)
机构地区:[1]山东大学齐鲁交通学院,济南250000 [2]山东交通学院交通土建工程学院,济南250357 [3]中铁十四局集团第二工程有限公司,泰安271000
出 处:《科学技术与工程》2021年第24期10498-10505,共8页Science Technology and Engineering
基 金:国家自然科学基金青年科学基金(50909056);山东省自然科学基金面上项目(ZR2014EEM014);山东交通学院基金(50004955)。
摘 要:针对矩形顶管施工穿越土层段地表全范围沉降规律难以准确获取的问题。依托太原地铁2号线长风街站地下通道工程,基于位移反分析理论,综合应用黄金分割法和数值仿真方法,提出了土体弹性模量E与黏聚力c的反演方法。从数值计算结果中可较为准确地获得地表全范围沉降规律。结果表明:相比单测点反演土层参数E、c,选用三测点反演计算方法,更能准确地表达地表沉降规律。三测点反演迭代计算8次,沉降误差函数为0.0181,满足精度要求。选择两个不同位置的测点,对比分析其地表沉降数值计算值与实测值,相对误差分别为0.45%和0.29%;监测断面DBC8的地表沉降计算结果与实测值吻合较好,验证了多测点位移反分析方法的准确性。研究结果可为矩形顶管施工地表沉降规律研究提供一定的指导意义。When the rectangular pipe jacking construction passes through the soil layer,the surface settlement law is difficult to describe accurately.Comprehensive application of displacement back analysis theory,golden section method and numerical simulation,an inversion method of soil elastic modulus E and cohesive force c was proposed based on the Changfeng Street underpass project of Taiyuan Metro Line 2.The surface settlement law could be obtained accurately through numerical calculation.The results show that compared with E and c from the single-point inversion calculation,the surface settlement can be expressed more accurately by three-point inversion calculation.The settlement error is 0.0181,which satisfies the accuracy requirement after 8 times of inversion calculation.Comparing and analyzing the calculated and measured values of surface settlement at two different points,the relative errors are 0.45%and 0.29%,respectively.In addition,the calculated results of ground settlement of the monitoring section DBC8 are in good agreement with the measured values.The verification results confirm the accuracy of the multi-point displacement method.The results can provide certain guiding significance for the study of surface settlement law of rectangular pipe jacking construction.
关 键 词:地表沉降 土体力学参数 黄金分割 多测点位移反分析 数值模拟
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15