检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶新丰[1,3] 张宇 刘魁刚 高亚彬[1,3] 余鹏 YE Xinfeng;ZHANG Yu;LIU Kuigang;GAO Yabin;YU Peng(Beijing MTR Construction Administration Corporation,Beijing 100068;Beijing Infrastucture Investment Co.,Ltd.,Beijing 100101;Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit,Beijing 100068;China Railway Engineering Design and Consulting Group Co.,Ltd.,Beijing 100055)
机构地区:[1]北京市轨道交通建设管理有限公司,北京100068 [2]北京市基础设施投资有限公司,北京100101 [3]城市轨道交通全自动运行系统与安全监控北京市重点实验室,北京100068 [4]中铁工程设计咨询集团有限公司,北京100055
出 处:《都市快轨交通》2021年第3期70-76,共7页Urban Rapid Rail Transit
基 金:北京市轨道交通建设管理有限公司双创基金资助(SCJJ2020007)。
摘 要:阐述地铁施工阶段地质风险特征及研究现状,结合勘察、设计、第三方监测等资料,分析可能导致事故的潜在地质因素并进行分类和辨识,提出基于风险发生概率和危害结果的PH地质风险评价方法并给出相应参考值,根据评价结果提出过程监控、加强探测和现场处置三类处理措施。基于北京市轨道交通风险管理体系,构建施工阶段地质风险动静态管控机构及工作流程,将该机制应用于北京地铁昌平线南延西土城站项目的风险管控工作,已取得良好的效果。This paper describes the characteristics and research status of geological risk in the subway construction stage.The study also analyzes,identifies,and classifies the potential geological factors that may lead to accidents based on the geological survey data,design,and third-party monitoring.Strategies are also proposed based on the risk probability and geological hazard and risk assessment method of the pH value and corresponding reference value.Three types of treatment measures are suggested:process monitoring,strengthening detection,and onsite disposal.The risk management system of Beijing Mass Transit Railway as well as the dynamic and static control mechanisms and working processes of geological risk in the construction stage is applied to the risk management system of Xitucheng station,which is the South extension of the Changping Line of Beijing Metro.Satisfactory results were obtained.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30