检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:华晓晔 周全 丁鸿志 Hua Xiao-ye;Zhou Quan;Ding Hong-zhi
出 处:《建筑技术开发》2021年第17期112-114,共3页Building Technology Development
摘 要:岸边堆载、河床冲淤及潮汐荷载等因素将导致水下隧道建成后继续出现沉降,差异沉降过大时将给运营安全带来一定威胁。针对刚建成通车的南京夹江隧道,通过隧道结构纵向受力特性模拟,分析了陆域段堆土、江中河床冲刷和水位变化工况下结构的纵向沉降特性,讨论了典型区段的差异沉降分布规律及其对接头受力、防水影响,用于评估运营安全状态。分析表明,在保证管片预制和拼装质量的前提下,运营期堆载、冲淤、潮汐变化不会降低结构的纵向承载及防水性能。Factors such as shore loading,riverbed erosion and siltation,and tidal loads will cause underwater tunnel to continue to settle after its completion.If the differential settlement is too large,it will pose a certain threat to operational safety.Aiming at the Nanjing Jiajiang Tunnel,which has just been opened to traffic,through simulation of longitudinal force characteristics of the tunnel structure,longitudinal settlement characteristics of the structure under the conditions of soil piling,river bed erosion and water level changes in the land section are analyzed,and the differences in the typical sections are discussed.The distribution law of settlement and its influence on force and waterproof performance of joints are used to guide assessment of operational safety status.The analysis shows that under the premise of ensuring quality of segment prefabrication and assembly,stacking,scouring and silting,and tidal changes during the operation period will not reduce longitudinal load-bearing and waterproof performance of the structure.
分 类 号:U457.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171