利用六西格玛原理降低高线吐丝机故障率  

USING SIX SIGMA PRINCIPLE TO REDUCE THE FAILURE RATE OF HIGH SPEED WIRE DRAWING MACHINE

在线阅读下载全文

作  者:周杨 Zhou Yang(The First Steel and Rolling Factory of HBIS of Group Xuangang Electromechanical Company Xuanhua 075100,China)

机构地区:[1]河钢宣钢机电公司,宣化075100

出  处:《冶金信息导刊》2021年第4期9-11,共3页Metallurgical Information Review

摘  要:吐丝机作为宣钢高线厂高速区关键设备部件,对于成品外观起着重要作用,严重影响对外销售客户满意度,影响销售效益。为降低吐丝机设备运行年故障次数,利用六西格玛管理方法,通过D-定义、M-测量、A-分析、I-改进、C-控制五个阶段工作,年吐丝机故障次数比往年同期大幅减少,达到了预期效果。As the key equipment component of high-speed zone in high-speed wire rod plant of Xuanhua Iron and Steel Co.,Ltd.,the wire drawing machine plays an important role in the appearance of finished products,which seriously affects the customer satisfaction of external sales and sales efficiency.In order to reduce the annual failure frequency of the spinning machine,the Six Sigma management method is used.Through the five stages of d-definition,m-measurement,a-analysis,i-improvement and C-control,the annual failure frequency of the spinning machine is greatly reduced compared with the same period in previous years,and the expected effect is achieved.

关 键 词:六西格玛 吐丝机 故障次数 

分 类 号:F27[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象