已建市政地下通道结构下盾构连续穿越桩基施工技术  被引量:6

Construction Technology of Shield Continuous Crossing Pile Foundation Under Built Municipal Underpass Structure

在线阅读下载全文

作  者:王传富 WANG Chuanfu(Shanghai Foundation Engineering Group Co.,Ltd.,Shanghai 200002,China)

机构地区:[1]上海市基础工程集团有限公司,上海200002

出  处:《建筑施工》2021年第10期2013-2015,2022,共4页Building Construction

摘  要:针对上海轨道交通14号线12标浦东南路站—浦东大道站—源深路站区间东西通道工程桩基侵入盾构断面的特殊工况,结合桩基对盾构机的影响、桩基及复杂地层对盾构施工的影响,通过前期调查、盾构机选型、同步注浆系统改造、铰接装置优化、盾尾刷油脂充填优化、盾构穿越桩基的施工流程细化,形成完整的施工工艺,使盾构穿越平稳、安全,并保障了东西通道及区间隧道结构的稳定。In view of the special working condition of the pile foundation invading the shield section of Pudong South Road Station-Pudong Avenue Station-Yuanshen Road Station section of Bid 12 of Shanghai Rail Transit Line 14,combined with the impact of pile foundation on shield machine and the impact of pile foundation and complex stratum on shield construction,a complete construction process is formed by preliminary investigation,shield machine selection,synchronous grouting system transformation,articulated device optimization,shield tail brush grease filling optimization,and construction process refinement of shield crossing pile foundation.The construction process of shield tunneling through pile foundation is refined to form a complete construction process.

关 键 词:盾构机选型 同步注浆 铰接装置 盾尾油脂 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象