检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李阳 宫志群 赵峰 高东波 姜岩 王文龙[4] LI Yang;GONG Zhiqun;ZHAO Feng;GAO Dongbo;JIANG Yan;WANG Wenlong(Infrastructure Business Division of China State Construction Corporation,Beijing 100029,China;Eastern China of China State Construction Investment Co.,Ltd.,Xuzhou,Jiangsu 221005,China;China Construction Tunnel Co.,Ltd.,Chongqing 401320,China;State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Xuzhou,Jiangsu 221116,China)
机构地区:[1]中国建设基础设施有限公司,北京100029 [2]中建华东投资有限公司,江苏徐州221005 [3]中建隧道建设有限公司,重庆401320 [4]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221116
出 处:《施工技术(中英文)》2021年第19期32-36,共5页Construction Technology
基 金:中建股份科技研发计划资助项目(CSCEC-2017-Z-25,CSCEC-2018-Z-30);江苏省住房和城乡建设厅项目(2019ZD079)。
摘 要:以徐州轨道交通某座集明、暗、盖挖为一体的大型换乘车站为工程背景,分析了进站左右线隧道联络通道上方地层突降水对其邻近隧道衬砌的影响。通过理论计算和数值模拟等方法获得隧道联络通道衬砌沉降规律,并分析了围岩应力-应变状态。计算结果表明,地层突降水会使其附近的隧道衬砌产生明显沉降,获得最大沉降发生位置。基于初衬计算结果对原始方案进行了优化,提出了针对性控制措施。Based on the research background of the first domestic large-scale transfer station integrating open-cut,subsurface excavation,cover and cut of an Xuzhou rail transit line,the effect of the stratum sudden precipitation of the tunnel’s left and right line of the station on the the adjacent tunnel lining was analyzed.Through established theoretical calculations,numerical simulations and other methods,the settlement law of the lining of the tunnel connecting aisle is obtained,and the stress-strain state of the surrounding rock is analyzed.The calculation results show that the stratum sudden precipitation will cause obvious settlement of the tunnel lining nearby and obtain the maximum settlement location.Based on the calculation results of primary lining,the original scheme is optimized,and targeted control measures were proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3