检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁春岩[1] 曲梓宁 田秀娟 秦雪 LIANG Chun-yan;QU Zi-ning;TIAN Xiu-juan;QIN Xue
机构地区:[1]吉林建筑大学交通科学与工程学院,吉林长春130118
出 处:《内蒙古公路与运输》2021年第5期55-58,共4页Highways & Transportation in Inner Mongolia
基 金:吉林省教育厅“十三五”科学技术项目(JJKH20200285KJ)。
摘 要:根据快速路匝道出口交织区交通流特性,将交通流划分为五个状态,利用模糊均值聚类(FCM)方法,以流量和占有率作为特征属性得到不同时段交通状态,以此作为启动信号控制的阈值,建立信号配时优化算法。文章以长春市快速路匝道出口交织区实际数据为基础,对信号配时优化方法进行验证。结果表明:高峰期间交织区交通状态明显提升,延误和冲突有明显下降,拥堵状态得到有效改善。According to the characteristics of the traffic flow in the interweaving zone at the exit of the expressway ramp,the traffic flow was divided into five states.The fuzzy mean clustering(FCM)method was used to obtain traffic status in different periods with the flow and occupancy as the characteristic attributes,which were used as the threshold value of the starting signal control to establish the signal timing optimization algorithm.Based on the actual data of the interweaving area connected by the ramp exit of a representative expressway in Changchun,the signal timing optimization method was verified.The results show that the traffic state in the interweaving area during peak hours is significantly improved,delays and conflicts are significantly reduced,and congestion is effectively improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4