作 者:苏诗玮 陆春杰 张彦红 李洁[1] Su Shiwei;Lu Chunjie;Zhang Yanhong;Li Jie(College of Civil Engineering,Nanjing Forestry University,Nanjing,210037;Changzhou Greening Management Guidance Station,Changzhou,213000;China Railway(Shanghai)Investment Group Co.,Ltd.,Shanghai,201100)
机构地区:[1]南京林业大学土木工程学院,江苏南京210037 [2]常州市绿化管理指导站,江苏常州213000 [3]中铁(上海)投资集团有限公司,上海201100
出 处:《建设科技》2021年第20期65-69,共5页Construction Science and Technology
摘 要:大标段规模大、分工深化,另外承包商往往忽视职能部门的横向协调,导致大量矛盾冲突发生在组织界面。为了解决这些问题,本文以南京地铁X号线项目为例,通过驻点调研和访谈等方式,从动态和静态的角度对总承包管理部组织界面问题进行识别和分析。Large section scale is great and the division of labor is deepened.On the other hand,contractors often ignore the horizontal coordination of functional departments,resulting in a large number of conflicts occurring in the interface of the organization.In order to solve these problems,this paper,taking Nanjing Metro Line X project as an example,identifies and analyzes the organizational interface problems of the General Contracting Management Department from the dynamic and static perspectives by means of stationary point survey and interview.
分 类 号:U213.3[交通运输工程—道路与铁道工程]