检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭社会 李再帏[2] 时瑾[3] 马登科 TAN Shehui;LI Zaiwei;SHI Jin;MA Dengke(China Railway Shanghai Group Co.,Ltd.,Shanghai 200071,China;School of Urban Rail Transit,Shanghai University of Engineering and Technology,Shanghai 201620,China;School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China)
机构地区:[1]中国铁路上海局集团有限公司,上海200071 [2]上海工程技术大学城市轨道交通学院,上海201620 [3]北京交通大学土木建筑工程学院,北京100044
出 处:《中国铁道科学》2021年第6期58-67,共10页China Railway Science
基 金:国家自然科学基金资助项目(52078035)。
摘 要:以高速铁路悬索桥五峰山长江大桥为背景,运用多体动力学方法和有限单元法,建立车-线-桥动力相互作用模型,研究线路纵断面设置对千米级高铁悬索桥动力学行为的影响。结果表明:桥上纵断面坡段变化对行车安全性指标基本无影响,纵断面变坡点数量增加对车体垂向加速度有一定影响,但对运行舒适性影响不明显,大跨度桥上坡段长度可调整到200 m及以上;车-桥动力相互作用引起的悬索桥动态刚度不平顺易造成车体加速度呈现周期性振动,在进出竖曲线位置易与离心力引起的振动产生车体振动叠加效应;线路竖曲线半径从30000 m减小到25000和20000 m时,对应的车体加速度分别提高0.00341g和0.00827g,对应的轮重减载率分别增加0.00359和0.00898。Based on the high-speed railway suspension bridge Wufengshan Yangtze River Bridge,the train-track-bridge dynamic interaction model was established by using multi-body dynamics method and finite element method,and the influence of track profile setting on the dynamic behavior of high-speed railway suspension bridge with kilometer span was studied.The results show that the change of longitudinal profile slope on the bridge basically has no influence on the indexes of train operation safety.The increase in the number of longitudinal profile slope changing points has a certain effect on the vertical acceleration of car body,but the influence on the running comfort is not obvious.The length of the uphill section of the long-span bridge can be adjusted to 200 m or more.The dynamic stiffness irregularity of suspension bridge caused by vehicle-bridge dynamic interaction is prone to cause the periodic vibration of car body acceleration,and it tends to produce superposition effect of car body vibration with the vibration caused by centrifugal force at the position of the entrance and exit of vertical curve.When the vertical curve radius of the track decreases from 30000 m to 25000 and 20000 m,the corresponding car body acceleration increases by 0.00341 g and 0.00827 g respectively,and the corresponding wheel load reduction rate increases by 0.00359 and 0.00898 respectively.
关 键 词:千米级悬索桥 线路 纵断面 竖曲线 车-线-桥动力相互作用 动力学行为
分 类 号:U488.25[交通运输工程—载运工具运用工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200